Service

Concrete Driveways

New driveways and full replacements — broom, exposed aggregate or stamped — built on a compacted base to handle BC rain and freeze-thaw.

  • Removal & haul-away of old driveway
  • Compacted gravel base & rebar
  • Broom, exposed aggregate or stamped finish
  • Sealed and ready in 7 days

Driveways that stay flat and crack-free

Most driveway failures start underground. We excavate to the right depth, install and compact a proper gravel base, and reinforce the slab with rebar before a single yard of concrete arrives. The result is a driveway that drains correctly and resists the settling and heaving common across the Lower Mainland.

Finish options

  • Broom finish — clean, slip-resistant and budget friendly.
  • Exposed aggregate — the classic West Coast look, great traction in the rain.
  • Stamped & coloured — the look of stone or slate at a fraction of the cost.

What to expect

A typical residential driveway takes 3–5 days from removal to pour. You can walk on it after 24 hours and drive on it after 7 days.

Concrete Driveways — FAQ

How thick should a driveway be?

We pour residential driveways at a minimum of 4 inches, and 5–6 inches where heavier vehicles or RVs park.

Do you remove my old driveway?

Yes — demolition, disposal and haul-away are included in our quote.

Free estimate

Planning a pour this season?

Tell us about your project and get a free, detailed written quote — usually within 48 hours.

Call now